Mod_08_10
Housekeeping 2
RA Decision : Approved 26/02/2010 Standard

FRR

RA Decision

Mod_07_10
Change to Settlement query process to increase period allowed to raise settlement query on M+13 statements
RA Decision : Approved 18/02/2010 Standard

FRR

RA Decision

Mod_06_10
Change to Settlement query process to facilitate query of all settlement re-runs
RA Decision : Approved 18/02/2010 Standard

FRR

RA Decision

Mod_05_10
Clarification of the Submission of SRAs by Account ID
Recommended for Approval 05/02/2010 Standard

AP Only Mod

AP Notification

Mod_04_10
Addition of Fuel Type flag to Dispatch Instruction Data Transaction
Deferred Pending Standard
Mod_03_10
Trading Site definition amendment
RA Decision : Approved 26/02/2010 Standard

FRR

RA Decision

Mod_02_10
Validation of Technical Data: Further Extension of Interim Validation Process
RA Decision : Approved 26/02/2010 Standard

FRR

RA Decision

Mod_01_10
Alignment of Meter Data timelines for Autonomous Generator Units with timelines for other Generator Unit types
Deferred Pending Standard
Mod_46_09
Treatment of UI’s in Pumped Storage Units when Pumping
Deferred Pending Standard ESBPG Presentation
Mod_45_09
Loss Adjustments in the Calculation of the Cost of Running in the Procedure to Calculate final Uplift Values
Recommended for Approval Pending Standard

FRR

Mods Meeting 25 Presentations

Mod_44_09
Process for withdrawal of Modification Proposals
Implemented 21/01/2010 Standard

FRR

RA Decision

Mod_43_09
Clarification on Invoice SRAs and Currency Costs
Implemented 22/01/2010 Standard

AP Only Mod

AP Notification

Mod_42_09
Removal of Reference to Administered Settlement in Force Majeure Paragraphs
Implemented 12/01/2010 Standard

FRR

RA Decision

Mod_41_09
Aggregated Generator Unit Capacity Change
Implemented 21/01/2010 Standard

FRR

RA Decision

Mod_40_09

RA Modification Proposals

Implemented 21/01/2010 Standard

FRR

RA Decision

Mod_39_09
Housekeeping
Implemented 29/10/2009 Standard

FRR

RA Decision

Mod_38_09
Clarification of application of Resettlement Currency Costs
Implemented 29/10/2009 Standard

FRR

RA Decision

Mod_37_09
Correction of Instruction Profiling rules for Pumped Storage Units
Implemented 12/01/2010 Standard

Mod_37_09 Version 2

FRR

RA Decision

Mod_36_09
Extending interim provision for Error Supplier Unit calculation
Implemented 29/10/2009 Standard

FRR

RA Decision

Mod_35_09
Standing Offer Data
Recommended for Rejection Pending Standard AP Only Mod
Mod_34_09
Global Settlement
Deferred Pending Standard

Working Group 1 Report

Smearing Options Paper

Working Group 2 Report

PES Option A+

 

Mod_33_09
Force Majeure Reporting
Implemented 29/10/2009 Standard

FRR

RA Decision

Mod_32_09

Clarification to definition and use of Monthly Load Forecast

Implemented 21/08/2009 Standard

FRR

RA DECISION

Mod_31_09

Unit and Interconnector Forced Outage Rate Modifications

Implemented 29/10/2009 Standard

Attach_31_09

FRR

FRR ATTACHMENT 1

FRR ATTACHMENT 1A

RA Decision

Mod_30_09

Removal of restriction on Associated Site Supplier Units to DSUs

Withdrawn Pending Standard

Working Group Report

Meeting Minutes

Mod_29_09

Clarification on Settlement Statement – Only Settlement Day(s) affected republished

Withdrawn Pending Standard
Mod_28_09

Clarification on Settlement Statement – Full Settlement Period Republished

Implemented 18/08/2009 Standard

FRR

RA DECISION

Mod_27_09

Change to Letter of Credit Template wording for payment of charges

Implemented 01/12/2009 Standard

FRR

RA Decision

Mod_26_09

Removal of ambiguity in various clauses of Agreed Procedure 10

Withdrawn Pending Standard
Mod_25_09

Publication of two-year generation outage plans

Recommended for Approval Pending Standard

FRR

RA Response Letter

Mod_24_09
Definition of Tariff Year and correction of Loss Factor timelines
Recommended for Approval Pending Standard FRR
Mod_23_09
Additional Extension of Section 7 Clauses for calculation of Eligible Availability for Energy Limited Units
Implemented 01/09/2009 Standard

FRR

RA DECISION

Attach1

Mod_22_09
Subscript Correction Appendix N
Implemented 07/07/2009 Standard

FRR

RA DECISION

Mod_21_09
Credit Cover SRA Cancellation via email
Implemented 10/07/2009 Standard

FRR

RA DECISION

Attach1

Mod_20_09
Temporary extension of time allowance for submission of Formal Settlement Queries
Implemented Pending Standard

Mod_20_09_V2

FRR

RA Decision

Mod_19_09
Change to Currency Costs Smearing Rules
Implemented 10/07/2009 Standard

FRR

RA DECISION

Attach1

Mod_18_09
Error in table O.4  when a SYNC MWOF Dispatch Instruction is greater than  Maximum Generation
Implemented 07/07/2009 Standard

FRR

RA DECISION

Mod_17_09
Interim Provisions to correct misaligned DLAF/CLAF/TLAF timelines
Implemented 10/07/2009 Standard

FRR

RA DECISION

Mod_16_09
Modifications Committee Operations - AP12 Changes
Implemented 07/05/2009 Standard

Attach 1

AP NOTIFICATION

AP Mod Only

Mod_15_09
Modifications Committee Operations - Section 2 Changes
Implemented 01/09/2009 Standard

Mod_15_09_V2

FRR

RA DECISION

Mod_14_09
Use of Forecast Demand
Implemented 06/05/2009 Standard

FRR

RA DECISION

Mod_13_09
Meter Data Validation Process and Unit Registration
Implemented 18/05/2009 Standard

FRR

RA DECISION

Mod_12_09
Loss Adjustments in Constraint and Make Whole Payments
Recommended for Rejection Pending Standard

FRR

 

Mods Meeting 25 Presentations

 

Working Group Report

Attach_WG_12_09

Mod_11_09
Removal of ambiguity in various clauses of Agreed Procedures 10, 13 and 15
Implemented 07/05/2009 Standard

Attach 1

Attach 2

AP NOTIFICATION

AP Mod Only

Mod_10_09
Validation of Technical Data: Extension of Interim Validation Process
Implemented 29/04/2009 Standard

FRR

RA DECISION

Mod_09_09
Correction of Various Typos
Implemented 18/05/2009 Standard

FRR

RA DECISION

Mod_08_09
Publication of Shadow Prices & Units Setting Shadow Prices
Withdrawn Pending Standard

Mod_07_09
SEMO Cash Pooling
Implemented 27/05/2009 Standard

FRR

RA DECISION

Attach1

Mod_06_09
Data Queries by External Data Providers
Implemented 18/05/2009 Standard

FRR

Attach_V2

RA Decision

Mod_05_09
Operational Readiness Confirmation for Variable Generator Units, Classification Change
Implemented 28/05/2009 Standard

FRR

RA DECISION

Attach1

Attach2

Mod_04_09
Provision of Commencement Notice to System Operators, External Data Providers
Implemented 16/04/2009 Standard

FRR

RA DECISION

Attach 1

Attach 2

Mod_03_09
Credit Cover SRA Cancellation via email
Implemented 06/03/2009 Standard AP Mod Only
Mod_02_09
Further Extension of Section 7 Clauses for calculation of Eligible Availability for Energy Limited Units
Implemented 24/02/2009 Standard

FRR

RA DECISION

Mod_01_09
A collection of typographic and grammatical corrections
Implemented 31/03/2009 Standard

FRR

RA DECISION

Attach 1

Mod_68_08
Alignment of T&SC Section 7 provisions with delivery of Market System Development Plan
Implemented 10/01/2009 Urgent

FRR

RA DECISION

Mod_67_08

Correction to NPED metering deadlines for M+13 Re-Settle in AP16

Implemented 04/12/2008 Standard AP Mod Only
Mod_66_08
Long Term Consumption Adjustments
Implemented 25/03/2009 Standard

FRR

RA DECISION

Mod_65_08
Generator Unit Short Term Test Status
Recommended for Approval Pending Standard Working Group Report
Mod_64_08
Treatment of Generator Unit Registration Delays
Withdrawn Pending Standard
Mod_63_08
Market Audit Process Correction
Implemented 26/02/2009 Standard

FRR

RA DECISION

Mod_62_08
Publication of Daily Jurisdiction Error Supply MWh value
Implemented 31/03/2009 Standard

FRR

RA DECISION

Mod_61_08
AP1 Appendix T
Implemented 04/12/2008 Standard AP Mod Only
Mod_60_08
Changes to AP2 to reflect MO obligation to calculate MIUNs in enduring Code and IA responsibility to calculate and submit ATC.
Implemented 01/11/2008 Urgent

Mod_60_08_Attachment_AP2

AP Mod Only

Mod_59_08
Interconnector Unit Nominations: Zero Net Flow
Implemented 21/10/2008 Urgent AP Mod Only
Mod_58_08
Using Excess Cash Collateral to Make Payments
Implemented 11/02/2009 Standard

FRR

RA DECISION

Attach 1

Mod_57_08
Temporary extension to the time in which a Participant is entitled to file a Settlement Query
Implemented 17/02/2009 Standard

FRR

RA DECISION

Mod_56_08

Registration Data for Interconnectors

Implemented 23/10/2008 Standard

FRR

RA DECISION

Mod_55_08
Single Interconnector Loss Factor for an Interconnector
Implemented 23/10/2008 Standard

FRR

RA DECISION

Mod_54_08
Individual Warning Limit above the Default Warning Limit
Implemented 30/10/2009 Standard

FRR

RA DECISION

Mod_53_08
Clarification of Participant Identification
Implemented 03/10/2008 Standard AP Mod Only
Mod_52_08
Extension of Section 7 Clauses for calculation of Eligible Availability for Energy Limited Units.
Implemented 23/10/2008 Standard

FRR

RA DECISION

Mod_51_08
Extension of the T&SC Clauses 7.21, 7.28, 7.44 and 7.45 until the implementation of Day 1+
Implemented 23/10/2008 Standard

FRR

RA DECISION

Mod_50_08
Moving interim Error Supplier Unit calculation to the enduring Code
Implemented 23/10/2008 Standard

FRR

RA DECISION

Mod_49_08
Aggregate Payments for Invoices
Implemented 30/10/2009 Standard

FRR

RA DECISION

 

Mod_48_08
Additional items for Settlement Queries
Implemented 26/02/2009 Standard

FRR

RA DECISION

Mod_47_08
Validation of Technical Data: Enduring Validation Process
RA Decision : Approved 29/10/2010 Standard

Mod_47_08_V2

FRR

RA DECISION

Mod_46_08
Validation of Technical Data: Clarification of Interim Validation Process
Implemented 03/03/2009 Standard

FRR

RA DECISION

Mod_45_08
Validation of Technical Data: Extension of Interim Validation Process
Implemented 23/10/2008 Standard

FRR

RA DECISION

Mod_44_08
Variable and Ex Post Flattening Power Factors
Withdrawn Pending Standard

FRR

RA DECISION

Appendix_44_08_Report

Mod_43_08
Enduring Application of Distribution Loss Adjustment Factors
Implemented 01/01/2009 Urgent

FRR

RA DECISION

Mod_42_08
Submission and Publication of Forecast of Ex-Post Loss of Load Probability for each Trading Period in the forthcoming 31 Trading Days
Implemented 16/01/2009 Urgent

FRR

RA DECISION

Mod_41_08
Accession Fee in the form of Draft or EFT
Implemented 03/10/2008 Standard AP Mod Only
Mod_40_08
Interconnector SEM connection point – extension of interim arrangements
Implemented 23/10/2008 Standard

FRR

RA DECISION

Mod_39_08
Dispute Resolution Panel & Chairperson
Implemented 24/02/2009 Standard

FRR

RA DECISION

Attach1

Mod_38_08
Data Verification Period
Implemented 26/01/2009 Standard

FRR

RA DECISION

Mod_37_08

Extension of the application of the Capacity Adjustment Factor in the calculation of Required Credit Cover until implementation of Day 1+

Implemented 23/10/2008 Standard

FRR

RA DECISION

Mod_36_08
Agreed Procedure 15 Incorrect Title
Implemented 01/08/2008 Standard AP Mod Only
Mod_35_08
Extension of and amendment to existing provisions in relation to the application of Distribution Loss Adjustment Factors
Implemented 23/10/2008 Standard

FRR

RA DECISION

Mod_34_08

Dual Rated Generator Amendment

 

RA Decision : Approved Pending Standard

Mod_34_08_V2

Mod_34_08_V3

FRR

RA Dual Rated Consultation

RA Decision

Mod_32_08
Format of Invoices
Implemented 10/12/2008 Standard

FRR

RA DECISION

Mod_31_08

Credit Cover Warning Notices via email and no posted copies

 

Implemented 15/12/2008 Standard

FRR

RA DECISION

Mod_30_08
SEMO Branding
Implemented 06/10/2008 Standard

FRR

AP Mod Only

Mod_29_08
Typo in 4.134
Implemented 10/12/2008 Standard

FRR

RA DECISION

Mod_28_08_V2

Commercial Offer Data for Interconnector Units

Implemented 15/04/2009 Standard

FRR

RA DECISION

Attach 1

Mod_27_08

Format of Settlement Statements

Implemented 09/07/2008 Standard

FRR

RA DECISION

Mod_26_08
Definition of Adjusted Participant
Implemented 22/07/2008 Standard

FRR

RA DECISION

Mod_25_08
Extension of certain T&SC Section 7 provisions to allow for delivery of Market System Development Plan.
Implemented 09/07/2008 Standard

FRR

RA DECISION

Mod_24_08
Initial Credit Cover and Revised Effective Date Timelines for New Participants 
Implemented 09/07/2008 Standard

FRR

RA DECISION

Mod_23_08
Precision of calculations within the Central Market Systems
Implemented 17/02/2009 Standard

FRR

RA DECISION

Mod_22_08

Modification of Agreed Procedures

Implemented 11/07/2008 Standard

FRR

RA DECISION

Mod_21_08
AP12 Modifications Committee Operations (Working Groups, Secretariat role)
Implemented 17/06/2008 Standard

FRR

RA DECISION

APPENDIX TO MOD (AP12)

Mod_20_08
Nominations, Elections, Terms and Expiry of Modification Committee Members  
Implemented 08/08/2008 Standard

FRR

RA DECISION

Mod_19_08
Extension of the temporary manual System Operator validation of Technical Offer Data
Implemented 30/04/2008 Urgent

FRR

RA DECISION

Mod_18_08

Redraft of management of change to the CMS in AP11

Implemented in line with V 4.3 T&SC - Ref Mary D'arcy

Implemented 25/04/2008 Standard

AP Only Mod

ATTACHMENT

FRR

Mod_17_08
Definition of Hot Cooling Boundary, Hot Start, Warm Cooling Boundary, Warm Start, Cold Start
Implemented 30/01/2009 Standard

FRR

RA DECISION

Mod_16_08

Publication of Load Forecast Summary

Implemented 11/09/2008 Standard

AP Mod Only

FRR

Mod_15_08

Treatment of Interconnector Units

Implemented 26/06/2008 Standard

FRR

RA DECISION

Mod_14_08
Extension of cap on the maximum value of Settlement Reallocation Agreements
Implemented 21/05/2008 Standard

FRR

RA DECISION

Mod_13_08

Calculation of MSP Production Cost for use within the MSP Software - revised from Modification 57_07

 

Implemented 27/02/2009 Standard

FRR

RA DECISION

Mod History:

57_07

13_08

13_08 V2

Mod_12_08
Section 8 removal

 

Withdrawn Pending Standard Attachment
Mod_11_08
Extension of the temporary manual System Operator validation of MPR Technical Offer Data used in the MSP Software (Agreed Procedure 4)
Implemented 01/03/2008 Urgent

FRR

RA DECISION PAPER

Mod_10_08
Paragraph reference errors in the Code 
Implemented 21/05/2008 Standard

FRR

RA DECISION

Mod_09_08
Retaining Settlement Reallocation Agreements as firm on billing
Implemented 21/05/2008 Standard

FRR

RA DECISION

Mod_08_08
Exclusion of Ex-Post availability determination for Interconnector Units from 4.49  
Implemented 21/03/2008 Standard

FRR

RA DECISION

Mod_07_08
The setting of Market Scheduled Quantities for each type of Price Taker for each MSP Software Run
Implemented 21/03/2008 Standard

FRR

RA DECISION

Mod_06_08
Further detail of how Availability and Minimum Stable Generation are set for Interconnector Units
Implemented 21/03/2008 Standard

FRR

RA DECISION

Mod_05_08
Inclusion of Aggregated Generating Units in the SEM as Aggregated Generator Units 
Implemented 25/08/2008 Standard

FRR Appendices

FRR

RA DECISION

Mod_04_08
Revised Criteria for the Approval of Intermediary Applications – TSC changes required 
Implemented 21/03/2008 Standard

Mod_04_08 attachment

FRR

RA DECISION

Mod_03_08
Suspension Delay Period Decision Changes 
Implemented 18/02/2009 Standard

FRR

RA DECISION

Mod_02_08

Correction of error in paragraph 4.91 

Version 4.2 Code

Implemented 26/03/2008 Standard

FRR

RA DECISION

Mod_01_08

Consumption Adjustments handling long term meter data errors

Withdrawn Pending Standard AP/Appendix
Mod_97_07
Publication of Shadow Prices and Uplift price
Withdrawn Pending Standard
Mod_96_07
Change to the payment period of the Variable and Fixed Market Operator Charge 
Implemented 20/12/2007 Urgent

Final Recommendation Report

RA Decision

Mod_95_07
Correction of inconsistent publication timings in Appendix E and  AP6
Implemented 21/12/2007 Standard

FINAL RECOMMENDATION REPORT

RA DECISION

Mod_94_07
Calculation Rounding
Withdrawn 30/09/2008 Standard

FRR

RA DECISION

Mod_93_07
Demand Data Submissions to Support Non-Firm Access Calculations for all forms of Trading Site
Withdrawn Pending Standard Attachment 1
Mod_92_07
Emergency Communications between MDPs and Market Operator
Implemented 21/12/2007 Standard

Attachment 1

Attachment 2

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_91_07
Supplier of Last Resort process change
Implemented 04/02/2008 Standard

Attachment

FRR

Mod_90_07
Consumption Adjustments handling long term meter data errors
Withdrawn Pending Standard

Attachment 1

Mod_89_07
Inclusion of Meter Data Provision timelines in the Settlement Calendar, and clarification to definitions in AP16
Implemented 21/12/2007 Standard

RA DECISION

Final recommendation Report

Mod_88_07
Publication of daily actual load summary 
RA Decision : Approved 30/04/2010 Standard

FRR

RA DECISION

Mod_87_07
Publication of aggregated loss adjusted net demand ∑(NDLF) for all suppliers in Ireland(ROI & NI)
Implemented 16/01/2009 Standard

RA DECISION

FRR

Mod_86_07
Publication of Shadow Price
Implemented 16/01/2009 Standard

RA DECISION

FRR

 

Mod_85_07
D-1 SMP Prices  (Daily Ex-ante) to be published by MO in PDF format at 13:00 hours daily
Withdrawn Pending Pending
Mod_84_07
Modification to Settlement Reallocation process in AP10 
Implemented 04/02/2008 Pending

FRR

Mod_83_07
Remove Requirement to send Warning Limit Notices for Generators
Implemented 20/12/2007 Standard

RA DECISIONS

FINAL RECOMMENDATION REPORT

Mod_82_07
Eligible Availability for Energy Limited Units
Implemented 01/12/2007 Urgent

RA decision

FINAL RECOMMENDATION REPORT

Mod_81_07
Move spurious Glossary page in Appendix A to Section 8
Implemented 21/12/2007 Standard

FINAL RECOMMENDATION REPORT

RA DECISION

Mod_80_07

Clarification of  Pumped Storage Cycle Efficiency

Withdrawn Pending Standard
Mod_79_07
Treatment of Commercial Offer Data by the MSP Software in the last six hours of the Optimisation Time Horizon
Implemented 01/11/2007 Urgent

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_78_07
APPENDIX A: STANDARD LETTER OF CREDIT amendments
Implemented 22/10/2007 Urgent

FINAL RECOMMENDATION REPORT

RA DECISION

Mod_77_07
Temporary manual System Operator validation of MPR Technical Offer Data used in EPUS (Agreed Procedure 4)
Implemented 01/11/2007 Urgent

RA DECISION

FRR

Mod_76_07
Temporary Change to SRA submission rules
Implemented 01/11/2007 Urgent

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_75_07
Changing of the Settlement Reallocation window close to 12:00 in both the TSC & AP10
Implemented 01/11/2007 Urgent

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_74_07
Currency cost in Calculations for the Undefined Exposure Period for a Standard Participant
Implemented 01/11/2007 Urgent

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_73_07
Payment Details Required for Same Day Payments
Implemented 01/11/2007 Urgent

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_72_07
Correction of Excessive Credit Cover Requirement
Implemented 16/01/2009 Urgent

Attachment

FRR

RA DECISION

RA DECISION 20082008

Mod_71_07
Timing of Capacity Invoice
Implemented 01/11/2007 Urgent

Appendix data publications

RA DECISION

FINAL RECOMMENDATION REPORT

FINAL RECOMMENDATION REPORT APPENDIX

 

Mod_70_07
Currency Cost Charge in Actual Exposure
Implemented 01/11/2007 Urgent

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_69_07
CPM - Definition of Interim Ex Post Loss of Load Probability, I?h
Implemented 01/11/2007 Urgent

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_68_07
Additional Market Data Transaction from SMO to TSOs
Deferred Pending Urgent

RA DECISION

FRR

Mod_67_07
Balancing Cost 
Implemented 01/11/2007 Urgent

RA DECISION APPROVING PARTIALLY

FINAL RECOMMENDATION REPORT

Mod_66_07_V2
VAT
Implemented 18/02/2009 Urgent

Mod 1

FRR 1

FRR 2

RA DECISION

Mod_65_07
Section 6 
Implemented 01/11/2007 Urgent

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_64_07
Tie-Break definition
Implemented 01/11/2007 Urgent

RA DECISION

FINAL RECOMMENDATION REPORTS

Mod_63_07
Calculation of DOP for Predictable Price Takers
Implemented 21/12/2007 Standard

FINAL RECOMMENDATION REPORT

RA DECISION

Mod_62_07
Maximum Amounts for Settlement Reallocation Agreements
Implemented 01/11/2007 Urgent
Mod_61_07
Agreed Procedure 4
Implemented 01/11/2007 Urgent

RA COMMENT: NOT VETOED

FINAL RECOMMENDATION REPORT

Mod_60_07
Agreed Procedure 6 - Table 5.3
Implemented 01/11/2007 Urgent

Appendix

RA COMMENT (not vetoed)

FINAL RECOMMENDATION REPORT

Mod_59_07
Appendix E - Publication
Implemented 01/11/2007 Urgent

appendix

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_58_07

Appendix K - Market Data Transactions Section 7.31 & 7.32

Version 4.2 Code

Implemented 07/03/2008 Urgent

RA DECISION

FINAL RECOMMENDATION REPORT

FINAL RA DECISION

Mod_57_07
Calculation of MSP Production Cost for use within the MSP Software
Withdrawn Pending Urgent

RA DECISION

FINAL RECOMMENDATION REPORTS

 Linked to Mod 13_08

Mod_56_07
Derivation of Price Quantity Pairs for Generator Units
Implemented 01/11/2007 Urgent

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_55_07
Alignment of the Settlement Reallocation window close between the TSC & AP10
RA Decision : Rejected Pending Urgent

FINAL RECOMMENDATION REPORT

Mod_54_07
Modification to the upward revision of Modified Interconnector Unit Nominations subsequent to an increase in the Availab
Withdrawn Pending Urgent
Mod_53_07
Modification to the MAX function used in the Required Credit Cover Calculations
Withdrawn Pending Standard
Mod_52_07
Deferral of Release 1b of SMO Market Systems
Implemented 08/10/2007 Urgent

Final recommendation report

 

Mod_51_07
Release Deferral - Additional clauses in Section 7
Implemented 08/10/2007 Urgent

RA DECISION

Final Recommendation report

Mod_47_07
Correction to Eligible Availability Algebra for Energy Limited Generator Units in the Trading and Settlement Code
Withdrawn Pending Urgent
Mod_50_07
Clarify Code Publication
Withdrawn Pending Standard
Mod_49_07
Addition of Participant Change Management Requirements to AP11
Withdrawn Pending Urgent

RA DECISION

FINAL RECOMMENDATION REPORT

 Linked to Mod 18_08

 

Mod_48_07
Modification to wording of the Standard Letter of Credit in Appendix A of the T and SC
Withdrawn Pending Urgent Appendix to Mod 48
Mod_46_07
Urgent Modifications Process and Final Recommendation reports
Withdrawn Pending Standard
Mod_45_07
Interconnector point of connection
Implemented 01/11/2007 Urgent

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_44_07
Required strengthening of procedure to modify banking details.
Implemented 01/11/2007 Urgent

RA comment

 FRR

Mod_43_07
Clarification of rules for the calculation of Modified Interconnector Unit Nominations in AP2 
Withdrawn Pending Standard
Mod_42_07
Agreed Procedure 6 - Table 5.3 (redraft of Mod_17)
Withdrawn Pending Urgent Mod_42_Appendix
Mod_41_07
Appendix E - Publication (redraft of Mod_16)
Withdrawn Pending Urgent
Mod_40_07
Modifications Committee Operation Timelines
Withdrawn Pending Standard
Mod_39_07 
Instruction Profiling Time Lag
Implemented 30/09/2007 Urgent

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_38_07 
Net Demand in Capacity Charges Settlement Statement
Implemented 01/11/2007 Urgent

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_37_07 
Instruction Profiling: Load Up Characteristics, Ramp Up and Down Characteristics, Validation Rules
Implemented 01/11/2007 Urgent

appendix

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_36_07 
Definition of Pumped Storage Cycle Efficiency
Implemented 30/09/2007 Urgent

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_35_07 
Commercial Offer Data for Variable Price Taker Generator Units
Implemented 08/10/2007 Urgent

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_34_07 
Fixed Market Operator Charge for Interconnector Units
Implemented 30/09/2007 Urgent

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_33_07 
Referencing of Trading Day Exchange Rate
Implemented 30/09/2007 Urgent

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_32_07 

Interpretation of 1st Price Quantity Pair

Implemented Version 4.2 Code

Implemented 09/02/2008 Standard

FINAL RECOMMENDATION REPORT

RA DECISION

Mod_31_07 
Technical Offer Data - Cooling Boundary Data
Implemented 30/09/2007 Urgent

White paper

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_30_07 
Premium for Under Generation Definition
Implemented 08/10/2007 Urgent

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_29_07 
Appendix K - Market Data Transactions Section 7.31 & 7.32
Withdrawn Pending Urgent
Mod_28_07 
Deletion of Clause 7.29
Implemented 21/12/2007 Standard

FINAL RECOMMENDATION REPORT

RA DECISION

Mod_27_07 
Exclusion of Demand Side Units
Implemented 30/09/2007 Urgent

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_26_07 
Eligible Availability for Energy Limited Generator Unit
Implemented 30/09/2007 Urgent RA DECISION
Mod_25_07 
Commercial Offer Data for Interconnector Units
Withdrawn Pending Standard

FINAL RECOMMENDATION REPORT

RA DECISION

Mod_28_08 supersedes this Modification

Mod_24_07 
Dispatch Instructions for VPMG and VPTG Units
Implemented 30/09/2007 Urgent RA DECISION
Mod_23_07 
Market Operator Charge Invoices
Implemented 01/11/2007 Urgent

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_22_07
Modification to the same day valuation provision of the Standard Letter of Credit in Appendix A of the T and SC 
RA Decision : Rejected 21/09/2007 Urgent

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_21_07
Modification to the Expiry Date provision of the Standard Letter of Credit in Appendix A of the T and SC 
Implemented 08/10/2007 Urgent

Mod_21_07 Version 2

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_20_07
Publication of Commercially Sensitive Data - Supplier volumes 
Withdrawn Pending Urgent

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_19_07
Clarification of rules for the calculation of Modified Interconnector Unit Nominations in AP2 
Withdrawn Pending Urgent
Mod_18_07
Seven Errors in the Designated TSC 
Implemented 30/09/2007 Urgent

ra decision

Final recommendation report

Mod_17_07
Agreed Procedure 6
Withdrawn Pending Urgent

Mod_17_07_appendix

Mod_16_07
Appendix E - Publication
Withdrawn Pending Urgent
Mod_15_07
Amendment to LOLP Table mathematical formulation
Implemented 18/09/2007 Urgent

Mod_15_07_Appendix

RA decision approving Mod

Final recommendation report

Mod_14_07
Instruction Profiling:Load Up Characteristics, Ramp Up and Down Characteristics, Validation Rules and Lag Time
Withdrawn Pending Urgent
Mod_13_07
Agreed Procedure 6 (version 1 -withdrawn and revised as MOD 17_07
Withdrawn Pending Standard
Mod_12_07
Appendix E ; Publication (version 1 -withdrawn and revised as MOD 16)
Withdrawn Pending Standard
Mod_11_07
Calculation of Ex Post Energy Limits
Implemented 30/09/2007 Urgent

RA DECISION

final recommendation report

Mod_10_07
Market Operator Charge Invoices
Withdrawn Pending Standard
Mod_09_09

Administered Settlement – Meter Generation for Demand Side Units

Implemented 21/12/2007 Standard

FINAL RECOMMENDATION REPORT

RA DECISION

Mod_08_08
Application of Pumped Storage Ramp Rates
Implemented 30/09/2007 Urgent

RA DECISION

Final recommendation report

Mod_07_07
Calculation of DOP, MOP, DQCC & MQCC
Implemented 26/09/2007 Urgent

ra decision

Final recommendation report

Mod_06_07
Interconnector Transmission Loss Factors
Withdrawn Pending Standard
Mod_05_07
Interconnector Registration
Withdrawn Pending Standard
Mod_04_07
Ex Ante Availability for Price Maker Units Derivation of Price Quantity Pairs
Implemented 08/10/2007 Urgent

RA DECISION

Final recommendation report

Mod_03_07
Appendix J; Change to Day
Implemented 30/09/2007 Urgent

RA DECISION

FINAL RECOMMENDATION REPORT

Mod_02_07
Required strengthening of procedure to modify banking details
Withdrawn Pending Standard
Mod_01_07
Modifications to the Standard Letter of Credit in Appendix A of the T and SC 
Withdrawn Pending Urgent

SEMO is a joint venture between EirGrid plc and SONI Limited