Mod_27_08
Format of Settlement Statements |
New |
Pending |
Standard |
|
Mod_26_08
Definition of Adjusted Participant |
New |
Pending |
Standard |
|
Mod_25_08
Extension of certain T&SC Section 7 provisions to allow for delivery of Market System Development Plan. |
New |
Pending |
Standard |
|
Mod_24_08
Initial Credit Cover and Revised Effective Date Timelines for New Participants |
New |
Pending |
Standard |
|
Mod_23_08
Precision of calculations within the Central Market Systems |
New |
Pending |
Standard |
|
Mod_22_08
Modification of Agreed Procedures |
New |
Pending |
Standard |
|
Mod_21_08
AP12 Modifications Committee Operations (Working Groups, Secretariat role) |
New |
Pending |
Standard |
APPENDIX TO MOD (AP12) |
Mod_20_08
Nominations, Elections, Terms and Expiry of Modification Committee Members |
New |
Pending |
Standard |
|
Mod_19_08
Extension of the temporary manual System Operator validation of Technical Offer Data |
RA Decision : Approved |
Pending |
Urgent |
FRR RA DECISION |
Mod_18_08
Redraft of management of change to the CMS in AP11 |
Recommended for Approval |
Pending |
Standard |
ATTACHMENT FRR |
Mod_17_08
Definition of Hot Cooling Boundary, Hot Start, Warm Cooling Boundary, Warm Start, Cold Start |
Deferred |
Pending |
Standard |
|
Mod_16_08
Publication of Load Forecast Summary |
Recommended for Approval |
Pending |
Standard |
FRR |
Mod_15_08
Treatment of Interconnector Units |
Recommended for Approval |
Pending |
Standard |
|
Mod_14_08
Extension of cap on the maximum value of Settlement Reallocation Agreements |
Recommended for Approval |
Pending |
Standard |
FRR |
Mod_13_08
Calculation of MSP Production Cost for use within the MSP Software - revised from Modification 57_07 |
Deferred |
Pending |
Standard |
|
Mod_12_08
Section 8 removal |
Withdrawn |
Pending |
Standard |
Attachment |
Mod_11_08
Extension of the temporary manual System Operator validation of MPR Technical Offer Data used in the MSP Software (Agreed Procedure 4) |
RA Decision : Approved |
Pending |
Urgent |
FRR RA DECISION PAPER |
Mod_10_08
Paragraph reference errors in the Code |
Recommended for Approval |
Pending |
Standard |
FRR |
Mod_09_08
Retaining Settlement Reallocation Agreements as firm on billing |
Recommended for Approval |
Pending |
Standard |
FRR |
Mod_08_08
Exclusion of Ex-Post availability determination for Interconnector Units from 4.49 |
RA Decision : Approved |
Pending |
Standard |
FRR RA DECISION |
Mod_07_08
The setting of Market Scheduled Quantities for each type of Price Taker for each MSP Software Run |
RA Decision : Approved |
21/03/2008 |
Standard |
FRR RA DECISION |
Mod_06_08
Further detail of how Availability and Minimum Stable Generation are set for Interconnector Units |
RA Decision : Approved |
21/03/2008 |
Standard |
FRR RA DECISION |
Mod_05_08
Inclusion of Aggregated Generating Units in the SEM as Aggregated Generator Units |
Deferred |
Pending |
Standard |
|
Mod_04_08
Revised Criteria for the Approval of Intermediary Applications – TSC changes required |
RA Decision : Approved |
Pending |
Standard |
Mod_04_08 attachment FRR RA DECISION |
Mod_03_08
Suspension Delay Period Decision Changes |
Deferred |
Pending |
Standard |
|
Mod_02_08
Correction of error in paragraph 4.91 |
RA Decision : Approved |
26/03/2008 |
Standard |
FRR RA DECISION |
Mod_01_08
Consumption Adjustments handling long term meter data errors |
Deferred |
Pending |
Standard |
AP/Appendix |
Mod_97_07
Publication of Shadow Prices and Uplift price |
Withdrawn |
Pending |
Standard |
|
Mod_96_07
Change to the payment period of the Variable and Fixed Market Operator Charge |
Implemented |
20/12/2007 |
Urgent |
Final Recommendation Report RA Decision |
Mod_95_07
Correction of inconsistent publication timings in Appendix E and AP6 |
Implemented |
21/12/2007 |
Standard |
FINAL RECOMMENDATION REPORT RA DECISION |
Mod_94_07
Calculation Rounding |
Recommended for Approval |
Pending |
Standard |
|
Mod_93_07
Demand Data Submissions to Support Non-Firm Access Calculations for all forms of Trading Site |
Deferred |
Pending |
Standard |
Attachment 1 |
Mod_92_07
Emergency Communications between MDPs and Market Operator |
Implemented |
21/12/2007 |
Standard |
Attachment 1 Attachment 2 RA DECISION FINAL RECOMMENDATION REPORT |
Mod_91_07
Supplier of Last Resort process change |
Implemented |
Pending |
Standard |
Attachment 1 FRR |
Mod_90_07
Consumption Adjustments handling long term meter data errors |
Withdrawn |
Pending |
Standard |
Attachment 1
|
Mod_89_07
Inclusion of Meter Data Provision timelines in the Settlement Calendar, and clarification to definitions in AP16 |
Implemented |
21/12/2007 |
Standard |
RA DECISION Final recommendation Report |
Mod_88_07
Publication of daily actual load summary |
Deferred |
Pending |
Standard |
|
Mod_87_07
Publication of aggregated loss adjusted net demand ∑(NDLF) for all suppliers in Ireland(ROI & NI) |
RA Decision : Approved |
Pending |
Standard |
RA DECISION FRR |
Mod_86_07
Publication of Shadow Price |
RA Decision : Approved |
Pending |
Standard |
RA decision FRR |
Mod_85_07
D-1 SMP Prices (Daily Ex-ante) to be published by MO in PDF format at 13:00 hours daily |
Withdrawn |
Pending |
Pending |
|
Mod_84_07
Modification to Settlement Reallocation process in AP10 |
Implemented |
Pending |
Pending |
FRR |
Mod_83_07
Remove Requirement to send Warning Limit Notices for Generators |
Implemented |
20/12/2007 |
Standard |
RA DECISIONS FINAL RECOMMENDATION REPORT |
Mod_82_07
Eligible Availability for Energy Limited Units |
Implemented |
01/12/2007 |
Urgent |
RA decision FINAL RECOMMENDATION REPORT |
Mod_81_07
Move spurious Glossary page in Appendix A to Section 8 |
Implemented |
21/12/2007 |
Standard |
FINAL RECOMMENDATION REPORT RA DECISION |
Mod_80_07
Clarification of Pumped Storage Cycle Efficiency |
Withdrawn |
Pending |
Standard |
|
Mod_79_07
Treatment of Commercial Offer Data by the MSP Software in the last six hours of the Optimisation Time Horizon |
Implemented |
01/11/2007 |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORT |
Mod_78_07
APPENDIX A: STANDARD LETTER OF CREDIT amendments |
Implemented |
22/10/2007 |
Urgent |
FINAL RECOMMENDATION REPORT RA DECISION |
Mod_77_07
Temporary manual System Operator validation of MPR Technical Offer Data used in EPUS (Agreed Procedure 4) |
Implemented |
01/11/2007 |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORT |
Mod_76_07
Temporary Change to SRA submission rules |
Implemented |
01/11/2007 |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORT |
Mod_75_07
Changing of the Settlement Reallocation window close to 12:00 in both the TSC & AP10 |
Implemented |
01/11/2007 |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORT |
Mod_74_07
Currency cost in Calculations for the Undefined Exposure Period for a Standard Participant |
Implemented |
01/11/2007 |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORT |
Mod_73_07
Payment Details Required for Same Day Payments |
Implemented |
01/11/2007 |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORT |
Mod_72_07
Correction of Excessive Credit Cover Requirement |
Recommended for Approval |
Pending |
Urgent |
Attachment FRR RA DECISION |
Mod_71_07
Timing of Capacity Invoice |
Implemented |
01/11/2007 |
Urgent |
Appendix data publications RA DECISION FINAL RECOMMENDATION REPORT FINAL RECOMMENDATION REPORT APPENDIX |
Mod_70_07
Currency Cost Charge in Actual Exposure |
Implemented |
01/11/2007 |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORT |
Mod_69_07
CPM - Definition of Interim Ex Post Loss of Load Probability, I?h |
Implemented |
01/11/2007 |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORT |
Mod_68_07
Additional Market Data Transaction from SMO to TSOs |
RA Decision Further review |
Pending |
Urgent |
RA DECISION FRR |
Mod_67_07
Balancing Cost |
Implemented |
01/11/2007 |
Urgent |
RA DECISION APPROVING PARTIALLY FINAL RECOMMENDATION REPORT |
Mod_66_07
VAT |
RA Decision Further review |
Pending |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORT |
Mod_65_07
Section 6 |
Implemented |
01/11/2007 |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORT |
Mod_64_07
Tie-Break definition |
Implemented |
01/11/2007 |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORTS |
Mod_63_07
Calculation of DOP for Predictable Price Takers |
Implemented |
21/12/2007 |
Standard |
FINAL RECOMMENDATION REPORT RA DECISION |
Mod_62_07
Maximum Amounts for Settlement Reallocation Agreements |
Implemented |
Pending |
Urgent |
|
Mod_61_07
Agreed Procedure 4 |
Implemented |
01/11/2007 |
Urgent |
RA COMMENT: NOT VETOED FINAL RECOMMENDATION REPORT |
Mod_60_07
Agreed Procedure 6 - Table 5.3 |
Implemented |
01/11/2007 |
Urgent |
Appendix RA COMMENT (not vetoed) FINAL RECOMMENDATION REPORT |
Mod_59_07
Appendix E - Publication |
Implemented |
01/11/2007 |
Urgent |
appendix RA DECISION FINAL RECOMMENDATION REPORT |
Mod_58_07
Appendix K - Market Data Transactions Section 7.31 & 7.32 |
RA Decision : Approved |
07/03/2008 |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORT |
Mod_57_07
Calculation of MSP Production Cost for use within the MSP Software |
RA Decision Further review |
Pending |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORTS |
Mod_56_07
Derivation of Price Quantity Pairs for Generator Units |
Implemented |
01/11/2007 |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORT |
Mod_55_07
Alignment of the Settlement Reallocation window close between the TSC & AP10 |
RA Decision : Rejected |
Pending |
Urgent |
FINAL RECOMMENDATION REPORT |
Mod_54_07
Modification to the upward revision of Modified Interconnector Unit Nominations subsequent to an increase in the Availab |
Deferred |
Pending |
Urgent |
|
Mod_53_07
Modification to the MAX function used in the Required Credit Cover Calculations |
Withdrawn |
Pending |
Standard |
|
Mod_52_07
Deferral of Release 1b of SMO Market Systems |
Implemented |
08/10/2007 |
Urgent |
Final recommendation report |
Mod_51_07
Release Deferral - Additional clauses in Section 7 |
Implemented |
08/10/2007 |
Urgent |
RA DECISION Final Recommendation report |
Mod_47_07
Correction to Eligible Availability Algebra for Energy Limited Generator Units in the Trading and Settlement Code |
Withdrawn |
Pending |
Urgent |
|
Mod_50_07
Clarify Code Publication |
Withdrawn |
Pending |
Standard |
|
Mod_49_07
Addition of Participant Change Management Requirements to AP11 |
RA Decision Further review |
Pending |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORT |
Mod_48_07
Modification to wording of the Standard Letter of Credit in Appendix A of the T and SC |
Withdrawn |
Pending |
Urgent |
Appendix to Mod 48 |
Mod_46_07
Urgent Modifications Process and Final Recommendation reports |
Withdrawn |
Pending |
Standard |
|
Mod_45_07
Interconnector point of connection |
Implemented |
01/11/2007 |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORT |
Mod_44_07
Required strengthening of procedure to modify banking details. |
Implemented |
01/11/2007 |
Urgent |
RA comment FRR |
Mod_43_07
Clarification of rules for the calculation of Modified Interconnector Unit Nominations in AP2 |
Withdrawn |
Pending |
Standard |
|
Mod_42_07
Agreed Procedure 6 - Table 5.3 (redraft of Mod_17) |
Withdrawn |
Pending |
Urgent |
Mod_42_Appendix |
Mod_41_07
Appendix E - Publication (redraft of Mod_16) |
Withdrawn |
Pending |
Urgent |
|
Mod_40_07
Modifications Committee Operation Timelines |
Withdrawn |
Pending |
Standard |
|
Mod_39_07
Instruction Profiling Time Lag |
Implemented |
30/09/2007 |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORT |
Mod_38_07
Net Demand in Capacity Charges Settlement Statement |
Implemented |
01/11/2007 |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORT |
Mod_37_07
Instruction Profiling: Load Up Characteristics, Ramp Up and Down Characteristics, Validation Rules |
Implemented |
01/11/2007 |
Urgent |
appendix RA DECISION FINAL RECOMMENDATION REPORT |
Mod_36_07
Definition of Pumped Storage Cycle Efficiency |
Implemented |
30/09/2007 |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORT |
Mod_35_07
Commercial Offer Data for Variable Price Taker Generator Units |
Implemented |
08/10/2007 |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORT |
Mod_34_07
Fixed Market Operator Charge for Interconnector Units |
Implemented |
30/09/2007 |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORT |
Mod_33_07
Referencing of Trading Day Exchange Rate |
Implemented |
30/09/2007 |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORT |
Mod_32_07
Interpretation of 1st Price Quantity Pair |
RA Decision : Approved |
09/02/2008 |
Standard |
FINAL RECOMMENDATION REPORT RA DECISION |
Mod_31_07
Technical Offer Data - Cooling Boundary Data |
Implemented |
30/09/2007 |
Urgent |
White paper RA DECISION FINAL RECOMMENDATION REPORT |
Mod_30_07
Premium for Under Generation Definition |
Implemented |
08/10/2007 |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORT |
Mod_29_07
Appendix K - Market Data Transactions Section 7.31 & 7.32 |
Withdrawn |
Pending |
Urgent |
|
Mod_28_07
Deletion of Clause 7.29 |
Implemented |
21/12/2007 |
Standard |
FINAL RECOMMENDATION REPORT RA DECISION |
Mod_27_07
Exclusion of Demand Side Units |
Implemented |
30/09/2007 |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORT |
Mod_26_07
Eligible Availability for Energy Limited Generator Unit |
Implemented |
30/09/2007 |
Urgent |
RA DECISION |
Mod_25_07
Commercial Offer Data for Interconnector Units |
RA Decision Further review |
Pending |
Standard |
FINAL RECOMMENDATION REPORT RA DECISION |
Mod_24_07
Dispatch Instructions for VPMG and VPTG Units |
Implemented |
30/09/2007 |
Urgent |
RA DECISION |
Mod_23_07
Market Operator Charge Invoices |
Implemented |
01/11/2007 |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORT |
Mod_22_07
Modification to the same day valuation provision of the Standard Letter of Credit in Appendix A of the T and SC |
RA Decision : Rejected |
21/09/2007 |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORT |
Mod_21_07
Modification to the Expiry Date provision of the Standard Letter of Credit in Appendix A of the T and SC |
Implemented |
08/10/2007 |
Urgent |
Mod_21_07 Version 2 RA DECISION FINAL RECOMMENDATION REPORT |
Mod_20_07
Publication of Commercially Sensitive Data - Supplier volumes |
RA Decision Further review |
Pending |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORT |
Mod_19_07
Clarification of rules for the calculation of Modified Interconnector Unit Nominations in AP2 |
Withdrawn |
Pending |
Urgent |
|
Mod_18_07
Seven Errors in the Designated TSC |
Implemented |
30/09/2007 |
Urgent |
ra decision Final recommendation report |
Mod_17_07
Agreed Procedure 6 |
Withdrawn |
Pending |
Urgent |
Mod_17_07_appendix |
Mod_16_07
Appendix E - Publication |
Withdrawn |
Pending |
Urgent |
|
Mod_15_07
Amendment to LOLP Table mathematical formulation |
Implemented |
18/09/2007 |
Urgent |
Mod_15_07_Appendix RA decision approving Mod Final recommendation report |
Mod_14_07
Instruction Profiling:Load Up Characteristics, Ramp Up and Down Characteristics, Validation Rules and Lag Time |
Withdrawn |
Pending |
Urgent |
|
Mod_13_07
Agreed Procedure 6 (version 1 -withdrawn and revised as MOD 17) |
Deferred |
Pending |
Standard |
|
Mod_12_07
Appendix E ; Publication (version 1 -withdrawn and revised as MOD 16) |
Withdrawn |
Pending |
Standard |
|
Mod_11_07
Calculation of Ex Post Energy Limits |
Implemented |
30/09/2007 |
Urgent |
RA DECISION final recommendation report |
Mod_10_07
Market Operator Charge Invoices |
Withdrawn |
Pending |
Standard |
|
Mod_09_09
Administered Settlement – Meter Generation for Demand Side Units |
Implemented |
21/12/2007 |
Standard |
FINAL RECOMMENDATION REPORT RA DECISION |
Mod_08_08
Application of Pumped Storage Ramp Rates |
Implemented |
30/09/2007 |
Urgent |
RA DECISION Final recommendation report |
Mod_07_07
Calculation of DOP, MOP, DQCC & MQCC |
Implemented |
26/09/2007 |
Urgent |
ra decision Final recommendation report |
Mod_06_07
Interconnector Transmission Loss Factors |
Withdrawn |
Pending |
Standard |
|
Mod_05_07
Interconnector Registration |
Withdrawn |
Pending |
Standard |
|
Mod_04_07
Ex Ante Availability for Price Maker Units Derivation of Price Quantity Pairs |
Implemented |
08/10/2007 |
Urgent |
RA DECISION Final recommendation report |
Mod_03_07
Appendix J; Change to Day |
Implemented |
30/09/2007 |
Urgent |
RA DECISION FINAL RECOMMENDATION REPORT |
Mod_02_07
Required strengthening of procedure to modify banking details |
Withdrawn |
Pending |
Standard |
|
Mod_01_07
Modifications to the Standard Letter of Credit in Appendix A of the T and SC  |
Withdrawn |
Pending |
Urgent |
|